• The Finish Package Trade-Off: Factory vs. Field
    Feb 27 2026
    Should you ship modules 100% complete—or leave some finishes for the field? The answer is more nuanced than the modular industry admits.

    This episode examines the factory-to-field finish ratio and why optimal total project delivery isn't the same as maximum factory completion.

    Topics covered:

    • The case for maximum factory finish—and where it breaks down
    • Transportation damage: why shipping perfect modules creates rework
    • Connection-dependent finishes that can't be factory-complete
    • High-end projects: when field-installed finishes actually improve quality
    • How to find the optimal ratio for your finish spec, transport distance, and labor market

    The goal isn't maximum factory completion—it's optimal total project delivery. This episode shows you how to find the balance.

    Built Different is brought to you by Spring Street Management Group. New episodes drop weekdays at 6 AM Pacific.

    Show More Show Less
    4 mins
  • Corridor and Core Strategy: Where Modular Gets Complicated
    Feb 26 2026
    How do you connect modular units into a functional building? The corridor and core strategy is where projects succeed or fail.

    This episode tackles one of modular's trickiest design decisions—how to handle horizontal and vertical circulation when your dwelling units ship as complete modules.

    Topics covered:

    • Corridor modules vs. field-built corridors: the trade-offs
    • Why shipping corridor modules means shipping air—and when that's still worth it
    • Fire-rating challenges at module-to-module connections
    • Core strategy: modular cores vs. site-built elevator shafts and stair towers
    • How labor market costs should drive your corridor and core decisions

    There's no single right answer—but there is a wrong one: assuming this strategy will figure itself out. It won't.

    Built Different is brought to you by Spring Street Management Group. New episodes drop weekdays at 6 AM Pacific.

    Show More Show Less
    5 mins
  • Bathroom Pods: The Module Within the Module
    Feb 25 2026
    What if you could prefabricate the most labor-intensive room in any building? That's exactly what bathroom pods deliver.

    This episode explores bathroom pods as a sub-assembly strategy—complete units with fixtures, tile, plumbing, and electrical that drop into modules at the factory.

    Topics covered:

    • Why bathrooms are the biggest labor sink in residential construction
    • How pod production improves waterproofing quality and reduces warranty claims
    • Schedule compression: from two weeks of trades to a single drop-in
    • The economics of scale—why pods work at 200 units but not 20
    • Build vs. buy: in-house pods versus specialized manufacturers

    Bathroom pods represent nested prefabrication that pushes modular economics further than modules alone. Learn when they make sense for your project.

    Built Different is brought to you by Spring Street Management Group. New episodes drop weekdays at 6 AM Pacific.

    Show More Show Less
    4 mins
  • The Module Size Question: Bigger Isn't Always Better
    Feb 24 2026
    Is bigger always better when it comes to module size? The answer will surprise you.

    This episode examines the hidden trade-offs in module sizing—and why the biggest module your factory can build might not be the right choice for your project.

    Topics covered:

    • Transportation constraints: permits, escorts, and the $5,000-per-unit cost of going wide
    • Site access realities: when your module can't make the turn
    • Crane capacity and why module weight becomes a hard limit
    • Factory capabilities and the cost of custom tooling
    • How to optimize across all constraints—not just factory completion

    Before you lock in module dimensions, run the numbers on transport, site logistics, and crane requirements. This episode shows you how.

    Built Different is brought to you by Spring Street Management Group. New episodes drop weekdays at 6 AM Pacific.

    Show More Show Less
    4 mins
  • Design for Modular: What Architects Get Wrong
    Feb 23 2026
    Why do so many modular projects fail at the design phase? Because architects approach modular the wrong way.

    In this episode, we break down the three critical mistakes architects make when designing for modular construction—and how to avoid them.

    Topics covered:

    • Why designing for modular means starting with constraints, not fighting them
    • The module grid problem: bathrooms, kitchens, and corridors that straddle seams
    • How over-customization kills factory economics
    • Why smart architects pick the factory first and design to their strengths
    • Transportation limits that shape every decision downstream

    Whether you're an architect new to modular or a developer vetting design partners, this episode reveals where design goes wrong—and how to get it right from day one.

    Built Different is brought to you by Spring Street Management Group. New episodes drop weekdays at 6 AM Pacific.

    Show More Show Less
    4 mins
  • What Has to Change for Modular to Scale
    4 mins
  • The Lender Education Problem
    4 mins
  • Why Developers Keep Saying No to Modular
    4 mins